Donate using PayPal

All photos in & around Jersey

Showing items 1 to 100 from total of 184,676 locations. Ordered by photo number.

Photo # Photo Caption Categorisation
192350 Photo #192350

Start of a short section of canalside cycleway

Cycleway:
Infrastructure
192349 Photo #192349

The cycle parking has been moved, and there's now a gate and No Cars signage - see #72095

Cycle parking:
Infrastructure
192348 Photo #192348

Horrible junction optimised for motor traffic and with absolutely no provision for cyclists or pedestrians to get across. Typical of Târgu Mureș.

Road environment:
Problem
192347 Photo #192347

Horrible junction optimised for motor traffic - dangerous for cyclists, and pedestrians have to go three sides of a square and wait for up to a minute for the crossing lights. Then there's a sizeable delay before pedestrians can cross, just to make it easy for any driver who can't be bothered to stop at the red. Typical of Târgu Mureș.

Road environment:
Problem
192346 Photo #192346

Not exactly a wheeling channel under the railway, and there's a railing in the way.

Other:
Problem
192345 Photo #192345

Târgu Mureș station - loads of space for cycle parking, but none provided.

Road environment:
Problem
192344 Photo #192344

Horrible junction optimised for motor traffic and with absolutely no provision for cyclists or pedestrians to get across. Typical of Târgu Mureș.

Road environment:
Problem
192343 Photo #192343

Abrupt end of cycleway at road junction no.2

Cycleway:
Problem
192342 Photo #192342

Abrupt end of cycleway at road junction no.1

Cycleway:
Problem
192341 Photo #192341

New path from Târnaveni to Seuca (about 1km apart) - not marked as shared-use, but I saw a cyclist using it.

Cycleway:
Infrastructure
192340 Photo #192340

Two-way cycleway in Târnaveni

Cycleway:
Infrastructure
192339 Photo #192339

Some kind of cycleway in Târnaveni

Cycleway:
Infrastructure
192338 Photo #192338

The Sighthill Bridge is finally open!

Cycleway:
Infrastructure
192337 Photo #192337

The Sighthill Bridge is finally open!

Cycleway:
Infrastructure
192336 Photo #192336

The new Sighthill.

Destination:
Infrastructure
192335 Photo #192335

The rather literal Stair Street.

Obstruction:
Infrastructure
192334 Photo #192334

'National Cycle Network' 🙄 t.co/qH6MvvujWR

Route sign:
Problem
192333 Photo #192333

[Image taken 27.3.23] York Racecourse, The Knavesmire, York. The barriers have been completely removed on this stretch. Context: #90867. I hope the more difficult to navigate ones (see: #168853, #168847) behind the camera will go too.

Cycleway:
Good practice
192332 Photo #192332

Severe chicane barrier near bungalows.

Track:
Infrastructure
192331 Photo #192331

Wadloes Road cycleway, where there's a little ramp added on the left linking to the path.

Cycleway:
Good practice
192329 Photo #192329

Howard Close

The cars are parked sticking out into the road, some in bays that appear to be designed for in-line parking.

Road environment:
Problem
192328 Photo #192328

Garages off Howard Close

Road environment:
Infrastructure
192327 Photo #192327

Garages off Howard Close

Road environment:
Infrastructure
192326 Photo #192326

Path from Howard Road toward Ditton Walk.

Cycleway:
Infrastructure
192325 Photo #192325

Shared use path between Ditton Walk, Wadloes Road and Howard Road.

There's a blind corner and so railings are used to slow and segregate.

Cycleway:
Infrastructure
192324

Bollards required to stop cars driving on the pavement when the lane is flooded.

Track:
Problem
192323

Toucan crossing required across the A325 dual carriage way

Temporary closure:
Problem
192322

So people can ride from Teynham to Faversham

Cycleway:
Problem
192321

Cycle Parking would be great for families wishing to ride to school. Could be in the village hall car park as there's more space.

Cycle parking:
Problem
192320

Very busy junction during school drop off and pick up times. Lots of pedestrians which should have right of way crossing this junction but drivers do not relent. More education of the highway code and signage required.

Congestion:
Problem
192319

The school entrance is very dangerous with cars swinging into Belle Friday Close at speed. Need them to slow down and give families priority crossing

Temporary closure:
Problem
192318

Lower Road is a fast road used by Cyclists, and there have been many accidents involving cyclists. Needs a priority space for them/better lighting/slow down traffic etc.

Cycleway:
Problem
192317

Cycleway required to access the retail park, at the moment from the station you cannot safely travel by bike to the north side of town. Cycleways do not link up making travelling anywhere safely very difficult by bike.

Cycleway:
Problem
192316

Congestion here is dreadful. Another entrance or exit or encourage other means of travel.

Congestion:
Problem
192315

Always congestion here and drivers do not abide by the yellow hatching making it unsafe for pedestrians to cross, even when the lights denote this.

Congestion:
Problem
192314

Lights for safe pedestrian crossing needed here

Congestion:
Problem
192313

Unsafe for pedestrians to cross in any direction at these very busy crossroads. Lights are required for pedestrian crossing.

Congestion:
Problem
192312

Cars parked either on, or partly on, the pavements. This narrows the road and leaves it difficult for pedestrians to pass on the pavement, especially with buggies. Cars are taking over the paths!

Congestion:
Problem
192311

Cars do not give away to pedestrians on the crossing. It's a very fast and dangerous road to cross and there are several schools in the vicinity.

Congestion:
Problem
192310

Toucan crossing needed here

Cycleway:
Problem
192309

20mph along Farnborough Road.
Since the HGV ban on upper ale Road, far more come down too fast, and children at all the schools are at risk.

Temporary closure:
Problem
192308 Photo #192308

What was once a traffic lane on #Coventry’s ring road now reduces severance and improves safety for people cycling.

Great to see a pop up scheme made permanent, made possible with ATF funding. t.co/eKyg0CNaAJ

Cycleway:
Good practice
192307

Allow contraflow shared used cycling on the footway across the bridge so NCN6 users do not have to cross the main road twice.

Cycleway:
Problem
192306

Busy narrow road needs traffic calming to slow cars down to help people on cycles get safely to the station.

Cycleway:
Problem
192305

Speeding cars ignore the smiley face signs. Needs proper speed cameras on this road.

Temporary closure:
Problem
192304

Make the pavement along this road into shared use as the road is very busy with cars going to the retail park.

Cycleway:
Problem
192303

Busway which is also a cycle route simply ends here on a busy road with no safe continuation. Off road route to the Parkway station needed as a minimum.

Cycleway:
Problem
192302

Toucan crossing here should be the official cycle route, not the route currently signed.

Cycleway:
Problem
192301

Toucan crossing here should be the official cycle route, not the route currently signed.

Cycleway:
Problem
192300

Cycle route here is daft. The isgned route makes you corss busy roads with no lights twice when there is a toucan crossing 50m up the road!

Cycleway:
Problem
192299

Signs here appear to predate the toucan crossings so you are signed to go south along the B579 and then pass under the railway via a non-existant route. The pavement on the north side of the road is only just wide enough for one bike. Road under the bridge should be reduced to one lane with traffic light control to prioritise pedestrians.

Cycleway:
Problem
192298

Needs an off road cycle path from NCN6 to the A505 junction.

Cycleway:
Problem
192297

Redesign junction to get cars on Vandyke Road to keep to the speed limit. Horribly fast driving by some people.

Cycleway:
Problem
192296

Very poor loose sand surface on this bridleway.

Cycleway:
Problem
192295

Whole route needs resurfacing to deal with tree route lumps and bumps.

Cycleway:
Problem
192294

Poor quality narrow bridge with barriers. Needs replaciing to make cycling possible for people on three wheels or tandems.

Cycleway:
Problem
192293

Sign the cycle route north south along these roads to encourage people to cycle to the town centre.

Cycleway:
Problem
192292

Major parking issues on Sunday here with lots of double yellow parking "just for a minute". Should be pedestrianised.

Temporary closure:
Problem
192291

Confusing signs here: I can cycle across the road but can I cycle through to Queensway?

Cycleway:
Problem
192290

Cycleway the length of Bell Road to allowing commuting into town for work, shopping or travelling to school. Very busy road where cars travel too fast.

Cycleway:
Problem
192289

There is no reason that this wide and smooth path shouldn't be used for bikes, children could cycle to Fulston school and many primary schools by allowing this path to be shared. (I'm referring to the footpath that runs from Core Court Road and around the UK Leisure, behind The Fieldings and then could join to the existing cycleway in Caple Road. This would provide a traffic free route from Core Court Road onwards, even onto Canterbury Road.

Cycleway:
Problem
192288

Bell Road provides a direct route to schools but it's such a fast road that cycling is actively discouraged. Desperately need a direct and safe route here which will encourage children to cycle to school so less traffic on the roads

Cycleway:
Problem
192287 Photo #192287

Just been away after leaving my bike for 1 night at @SouthernRailUK's supposedly secure cycle store at #Brighton to find someone tried to steal my bike by anglegrinding through its rear lock damaging the frame @sussex_police t.co/vSigTYY3BG

Road environment:
Good practice
192286 Photo #192286

Allocated space for Tier scooters, Bruxelles Midi station

Cycle parking:
Infrastructure
192285 Photo #192285

Covered cycle parking, Bruxelles Midi station

Cycle parking:
Infrastructure
192284 Photo #192284

Bike-sharing station, Bruxelles Midi station

Bike share:
Infrastructure
192283 Photo #192283

Cycle parking (with outsized bike), opposite Bruxelles Midi station

Cycle parking:
Infrastructure
192282 Photo #192282

Right Turn except cycles and route signs, Brussels

Route sign:
Infrastructure
192281 Photo #192281

No Entry except cycles and route signs, Brussels

Route sign:
Infrastructure
192280 Photo #192280

Cycle parking, contraflow signs and route signs, Brussels

Route sign:
Infrastructure
192279 Photo #192279

Modal filter, Brussels

Cycleway:
Infrastructure
192278 Photo #192278

Cycle parking at the Ermitage nano-brewery, Brussels

Cycle parking:
Infrastructure
192277 Photo #192277

Bike hangar, Brussels

Cycle parking:
Infrastructure
192276 Photo #192276

Route signs and bike hangar, Brussels

Route sign:
Infrastructure
192275 Photo #192275

An ordinary bike towing a courier trailer

Bicycle:
Event
192274 Photo #192274

Cycle contraflow signs and route signs, Brussels

Route sign:
Infrastructure
192273 Photo #192273

Cycle contraflow signs and route signs, Brussels

Route sign:
Infrastructure
192272 Photo #192272

Cycle parking, contraflow signs and route signs, Brussels

Cycle parking:
Infrastructure
192271 Photo #192271

Bike hangar and route signs, Brussels

Cycle parking:
Infrastructure
192270 Photo #192270

Cycle parking, contraflow signs and route signs, Brussels

Cycle parking:
Infrastructure
192269 Photo #192269

Cycle parking opposite Bruxelles Midi station

Cycle parking:
Infrastructure
192268 Photo #192268

Cycle parking at Bruxelles Midi station

Cycle parking:
Infrastructure
192267 Photo #192267

Traffic-free street past Bruxelles Midi station

Cycleway:
Infrastructure
192266 Photo #192266

Bike shop inside Bruxelles Midi station - Sorry, workshop fully booked.

Bike shop:
Infrastructure
192265 Photo #192265

Path parallel to the road across the stream

Track:
Infrastructure
192264 Photo #192264

[Image taken 19.3.23] York to Peterborough LNER service. [NOTE: This is a report by a friend. Uploaded by Rebba] “The 14.23 service. Cycle space reserved and showing on the ‘indicator lights’. Staff were helpful but I had to empty the locker of the passenger luggage before I could put my cycle in. I filled the space with as many cases as would fit once my cycle was installed. This left some cases in the vestibule. Had to reverse process at my destination. Other occasions there was a problem stowing my cycle: #190056, #183348, #174286.”

Other:
Event
192263 Photo #192263

A welcome intervention here, the council has removed pedestrian islands, removed all street parking, and installed very wide wand-protected cycleways. They've also built two zebra crossings.

This work was done so the council could remove the covid-era EATF cycle lanes from the Bridgewater Way road. This is a better route as it serves houses, businesses, etc - BW Way serves nothing.

Road environment:
Good practice
192262 Photo #192262

A welcome intervention here, the council has removed pedestrian islands, removed all street parking, and installed very wide wand-protected cycleways. They've also built two zebra crossings.

This work was done so the council could remove the covid-era EATF cycle lanes from the Bridgewater Way road. This is a better route as it serves houses, businesses, etc - BW Way serves nothing.

Road environment:
Good practice
192261 Photo #192261

These are not ghost bikes, just an installation of some kind.

Bicycle:
Misc
192260 Photo #192260

Guidance for cyclists encountering sheep dogs (very aggressive in Romania)

General sign/notice:
Infrastructure
192259 Photo #192259

Map of cycling routes around Homorod

Route sign:
Infrastructure
192258 Photo #192258

The roads and the drainage have been improved, but a shared-use path would really help - Rupea and Homorod aren't far apart.

Road environment:
Problem
192256 Photo #192256

A shared-use path of less than a kilometre would provide a safe link between Homorod and Rupea

Road environment:
Problem
192255 Photo #192255

A shared-use path of less than a kilometre would provide a safe link between Homorod and Rupea

Obstruction:
Problem
192254 Photo #192254

Path parallel to the road across the stream

Track:
Infrastructure
192253 Photo #192253

Path parallel to the road across the stream

Track:
Infrastructure
192252 Photo #192252

Cut-through in Richiș

Track:
Infrastructure
192251 Photo #192251

Path parallel to the road across the stream

Track:
Infrastructure
192250 Photo #192250

Path to the right parallel to the road across the stream

Track:
Infrastructure
192249 Photo #192249

Via Transilvanica markers in the centre of Richiș

Route sign:
Infrastructure

We welcome your feedback, especially to report bugs or give us route feedback.

My comments relate to: *






Your comments: *
URL of page: * https://jersey.cyclestreets.net/photos/all/
How did you find out about CycleStreets?:
Your name:
Our ref: Please leave blank - anti-spam measure

* Items marked with an asterisk [*] are required fields and must be fully completed.