You may also be interested in the automatic categorisation listings and themed galleries.
This listing only shows photos within a square radius of 5 kilometres of the centre of Jersey.
Go to the national CycleStreets photo listings for photos beyond.
Looking the opposite way from #194236, this shows the narrow ramp behind the wall to get around the steps to the right.
The start of the path from Shawbridge Street to Pollokshaws Road, for Pollok Country Park. But the sign says Auldhouse Park, which is the other way. This path is a short but steep ramp, to get around the steps beyond. See also #194237.
[Image taken 16.4.23] York Medical Group, Monkgate, York. [NOTE: No street view at this location.] If you had a wheeled walking aid or a sight issue and were not going into this building, I think you would expect there to be a ramp on the … [more]
Long-term temporary closure of the northbound (west side) cycleway and footway on the Erskine Bridge. All to use the path on the east side.
The ramp to exit Knockhill Park at Bruce Road is tricky to cycle up, but this will form part of the Renfrew to Paisley cycle route once it is finished.
The connection from Sighthill Circus to the Sighthill Bridge features steps and a double hairpin ramp.
[Image taken 7.10.22] Community Furniture Store, Raylor Centre, York. When there's no space in the cycle parking or the provision doesn't accommodate the cyclist or a cycle you get flyparking as here. But cycles parked crossways take up … [more]
[Image taken 28.9.22] Community Furniture Store (on the site of the Raylor Centre), James Street, York. Staff, volunteers, customers, people donating items have only this provision. It was full when I arrived but as the Store was closing … [more]
The ramp up to the Forth & Clyde Canal towpath from Lochburn Road has been made wider and resurfaced.
Ramps added to the canal bridges along the river bank - very helpful for tourists with wheeled luggage.
Ramps added to the canal bridges along the river bank - very helpful for tourists with wheeled luggage.
Ramps added to the canal bridges along the river bank - very helpful for tourists with wheeled luggage.
@scottishcanals the approach to the canal at Stockingfield is blocked by a car https://t.co/YGzt9A4nhx
Why advertise that the access ramps are open onto towpath at Stockingfield then allow vans to park on them forcing people into deep mud?. And I walked round from the house the other evening with yard brush to clean glass off I mentioned … [more]
Ramps have been added to some bridges over the canals by the Riva in Venice. Some are temporary structures made of scaffolding poles, but this one in front of the Danieli hotel has a permanent feel.
The zig-zag ramp and steps up from Kelvingrove into the new university campus extension are now open.
The zig-zag ramp and steps up from Kelvingrove into the new university campus extension are now open.
While the Nithsdale Road railway bridge is being rebuilt, the Strathbungo footbridge in Moray Place has been made accessible, in advance of its permanent replacement. The work involves timber ramps at each side, leading to a step-free … [more]
The path from Viewfield Road to the M8/A8 footbridge. The footbridge has a double-back ramp when it could have come straight down in this direction, avoiding wasting the time of people walking and cycling.
A counter, with strips for counting ramp users, and also for the steps, at the Centre Roundabout underpass.
The stepped footbridge over the Forth & Clyde Canal at Westerton has had wheeling ramps added at one side.
You are requested not to cycle at loads of places in this town. This is a narrow footbridge and most of the time when there are no pedestrians it is usable for cycling, but not in general and hence there are signs telling you not to do it. … [more]
[Image taken 4.2.22] Marygate Lane (ahead), junction with Railway Walk (to right of camera), Marygate car park, York. Now the compound has gone, you can see the hedges have been massively cut back. Does this make it safer feeling at night? … [more]
[Image taken 20.1.22] Dame Judi Dench Walk, York. [NOTE: The image on streetview shows the gap through the floodwall and works associated with the replacement of Scarborough Bridge in 2018/19 to make it accessible.] The trough between the … [more]
UPDATE: See: #177943. [Image taken 29.11.21] Dame Judi Dench Walk, York. [NOTE: The image on streetview shows the gap through the floodwall and works associated with the replacement of Scarborough Bridge in 2018/19 to make it accessible.] … [more]
[Image taken 26.11.21] Dame Judi Dench Walk, York. [NOTE: The image on streetview shows the gap through the floodwall and works associated with the replacement of Scarborough Bridge in 2018/19 to make it accessible.] Looking towards the gap … [more]
[Image taken 26.11.21] Dame Judi Dench Walk, York. [NOTE: The image on streetview shows the gap through the floodwall and works associated with the replacement of Scarborough Bridge in 2018/19 to make it accessible.] Context and links: … [more]
[Image taken 26.11.21] Dame Judi Dench Walk, York. [NOTE: The image on streetview shows the gap through the floodwall and works associated with the replacement of Scarborough Bridge in 2018/19 to make it accessible.] The narrow slope … [more]
[Image taken 26.11.21] Dame Judi Dench Walk, York. [NOTE: The image on streetview shows the gap through the floodwall and works associated with the replacement of Scarborough Bridge in 2018/19 to make it accessible.] The higher - white … [more]
[Image taken 23.11.21] Tanner's Moat, York. The 'plastic tray', the temporary wheelchair ramp, has gone: #171342. The works to replace the flood gates under Lendal bridge are complete. But I'd been assured the ramp would stay. People in … [more]
[UPDATE: 29.11.21. The gap now looks like this: #176252.] [25.11.21. The rough surface with the upstand is still as per the image. There is no sign of the temporary ramp/plastic tray. A local disabled organisation I asked about this … [more]
The start of the Bowline viaduct. Steps and a ramp connect the path to the canal towpath off to the right.
This footway is significantly busier than when the area to the left was a scrapyard and not student accommodation. But the COP26 diversion route has been signed over this regardless.
The soft segregation for the COP26 diversion route does not extend as far as the Castlebank Street junction, even though Beith Street is a very wide road for a one lane each way road. Cyclists are diverted back onto the narrow footway to … [more]
The ramps at the soft segregation provided for the COP26 diversion are tiny, and completely unusable should anyone turn up on anything other than a standard solo bicycle.
Although the former steps connecting Milton Mains Road and Glenhead Road to the Great Western Road shared footway have been replaced by a ramp (as seen in #107326), at the other end the nearest dropped kerb (just out of the picture) assumes … [more]
The area could do with tidying up, noting the routes people actually use, and to have some benches installed.
The crossing to the east of Bunhouse Road has now been provided with asphalt ramps to aid pedestrians crossing. No sign of either dropped kerbs or raised crossings being installed. Incorrect corduroy (hazard) tactile paving is still in … [more]
Tree root damage to the NCN7 path that has been left unattended to for so long that the actual root is now exposed. See also #99471.
A pothole in the ramp down to the Hayburn Street underpass on NCN7. Placeholder #125619 may concern this defect.
The area underneath the M8 motorway at Anderston Cross is being painted a couple of months before the COP26 conference hits town. The Anderston Bridge, Stobcross Bridge, and various roads are proposed to be closed during the conference, and … [more]
The canal path access next to the Centre81 community centre is now opened. There are steps and a hair-pin bend ramp. The community centre also has some cycle parking.
[UPDATE: The floodgates have been replaced. The route re-opened 19.11.21] [Image taken 9.8.21] Tanner's Moat/Wellington Row, York. Context see: #173062 and links. Clear signage for cyclists. A clear view of the ramp. The visibility means … [more]
A general view of the path parallel to Springburn Road, and the ramps down from Lenzie Terrace. The footbridge across Springburn Road is also visible
The ramp from Lenzie Terrace (see #173029) comes down to this landing, but the next ramp directly towards the Springburn Road footbridge has a couple of steps in it. This could be rebuilt. However, another ramp behind the camera provides a … [more]
The ramp from Lenzie Terrace up to Lenzie Place has some steps in it, and, out of sight, a short flight of concrete steps. There is space to rebuild it as an accessible step-free ramp, and assist with access between the Springburn Quietway … [more]
The tie-in between the bottom of the new ramp down from the Forth and Clyde Canal to Garscube Road is poor. A kerb blocks the entrance to the ramp from Firhill Road and a ramp has been provided facing Firhill Road but this appears to be for … [more]
The new ramp from Firhill Road and Garscube Road up to the Forth & Clyde Canal and the bridge to the Claypits nature reserve is now open. In addition to the ramp, there are steps available for pedestrians. Part of the Nextbike hire station … [more]
A new canal towpath access point has been created at the Centre81 community centre in Whitecrook. UPDATE: Now open.
A new steps and ramp access to the canal towpath is being built at the Centre81 community centre in Whitecrook. The towpath here has been resurfaced over a short distance.
[Image taken 10.7.21] Ramp between Scarborough Bridge and West Esplanade, York. [Note: There is no street view at this location.] Is this flyparked cycle secured here an indication cycle parking is needed nearby? Or signposting to the … [more]
[UPDATE: See #184936] [Image taken 17.9.20] Floodgate on Dame Judi Dench Walk, Marygate car park, York. The yellow 'tray' is a ramp intended to enable people to move up and down kerbs in wheelchairs, for example. But they flex and break … [more]
[UPDATE: The ramp has been removed #176078.] [Image taken 3.7.21] Tanner's Moat, York. Accessible space and infrastructure works for many people. This temporary ramp has been added for wheelchair users on the … [more]
The footway of Hillington Road (at least part of which is shared-use) is loosing width to the bush, which will need cut back at some point. The toucan crossing connects Penilee and Hillington as part of a minimal signage quietway style … [more]
The final section from the riverside path up to Inchinnan Road is quite steep, with a barrier at the top. See also #170232.
Maybe it's because I don't enter Speirs Wharf from Craighall Road very often, but I almost cycled down the cobbled slope since I was this time going to turn left down the ramp to Garscube Road. The layout here could be better. The steps … [more]
A ramp has been provided behind the bus stop, in addition to steps, to connect from Thornliebank Road up to Cartcraigs Road. (This does not form part of the cycle route, but could be used for connections to and from it.)
A flood prevention scheme has been implemented at Greenbank Park, and thus the entrances to the park have steps and ramps over the embankments that would contain any flooding. This is on the cycle route between Newlands and the Silverburn … [more]