You may also be interested in the automatic categorisation listings and themed galleries.
This listing only shows photos within a square radius of 5 kilometres of the centre of Jersey.
Go to the national CycleStreets photo listings for photos beyond.
Traffic at the Kelburn Street/Neilston Road junction. This is the nearest dropped kerb to the sign in #194605, and there are no shared-use signs further down the hill. Some sides of the crossing have toucan crossing displays, others do not, … [more]
The first sign to say this footway is shared use is hidden by a tree. No invitation to leave the carriageway to join it, and the nearest dropped kerb is back at the previous junction. The shared footway is not particularly wide, and … [more]
Footway ends, no pedestrian crossing, or even a dropped kerb, for crossing from the path, bus stop, or rail station, across Kennishead Road.
A new section of path has been provided at the northern end of the Erskine Bridge that avoids the need to drop down to the lower level then climb back up to this level to use the A82 path.
The path from the new bridge across the Black Cart Water continues for a short distance on this side of the A8 before crossing to the other side where it continues all the way to the edge of Bishopton.
The new bridge across the Black Cart Water, alongside the busy A8 Greenock Road. The new bridge uses a single span to cross the river.
Approaching the Inchinnan Road junction, and the new bridge across the Black Cart Water for Greenock Road. The shared footway continues alongside the A8 to the edge of Bishopton.
A general view of the road layout through the new business park at Netherton Square. The main downside is that the footway bends away from the road at a few minor sideroad crossings.
One of a number of parallel zebra crossings on the revised road network next to Glasgow Airport. There are continuous shared footways on both sides of the road from here to the Inchinnan Road junction, through the new business park.
Traffic on the Barnwell Street Bridge. The road bends sharply to go around a Glasgow Airport car park.
The Barnwell Street Bridge has been open since August 2022, and has a shared-use footway on the southern side. There is very little traffic on the road since it serves only a handful of industrial premises in what used to be the end of … [more]
The carriageway of Wright Street has a temporary fence across the full width of it, so cyclists are forced onto the footway to get around it, but the footway beyond is shared-use anyway.
The resurfaced footway of the otherwise abandoned Swordale Place. In combination with Kildermorie Road, useful for local trips across Easterhouse, avoiding the main roads, but with all the broken glass and other debris, a very unattractive … [more]
A poor road environment on Sauchiehall Street at Charing Cross, leading to these two cycling on the footway and traffic island. And they weren't the only ones.
A new (not even open) cycleway alongside Pinkston Road, approaching its end before the railway bridge.
The nearest dropped kerb to the start of the West Highland Way path is not convenient if coming from Ellangowan Road, and is located at the narrowest point in the footway. A second dropped kerb would be desirable further along nearer the … [more]
A footway has been formed using posts and blocks, leading to the narrow asphalt strip to Strathtay Avenue. See also #172687.
Stamford - dreadful pedestrian environment. Although this is a traffic signalled junction there are no phases in that for pedestrians and no crossing facilities. There's a large amount of motor traffic and very narrow footways.
Pedestrians forced to divert 10s of metres into Lombard Street because of a cycleway. Seems rather over-fussy, but I've only been in the city less than an hour so what do I know!
Zebra crossings across both the carriageway and cycleway on Bunhouse Road. It is unclear whether pedestrians are allowed or barred from the former shared use footway.
Video of using the footway because the road is so busy.. Mount Road, The Wirral https://twitter.com/edwardlamb/status/1484560443247149058?s=21
See #150276 and #191951. This has been reported: https://highwaysreporting.cambridgeshire.gov.uk?id=00384306.
40mph road, less than a metre's worth of path and hundreds of houses near by. This is fine. Humans aren’t getting enough exercise yet this is what they have to use when they do. We passed people out for walks and jogging. Everyone very … [more]
A fence has been built all around the Kelvingrove Art Gallery for the COP26 event. It blocks the footway (the one that might be shared-use due to the one-way carriageway) and the gate only opens across the carriageway,
This footway is significantly busier than when the area to the left was a scrapyard and not student accommodation. But the COP26 diversion route has been signed over this regardless.
No improvement at Argyle Street. However, the plastic barrier which had been pushed beyond the asphalt ramp has been restored to its intended position.
Narrow redesignated footway on expressway sliproad, with added fencing. When the fencing was installed, it blocked a dropped kerb at the toucan crossing ahead, but this had been resolved by the time I was there.
Very poor, unimproved roadside footway re-badged as a shared use path. Dreadful concrete surface, too narrow, vegetation encroaching. The cyclist in the picture has wisely chosen not to use it but this is a nasty stretch of road with HGVs … [more]
The soft segregation for the COP26 diversion on Beith Street does not even extend to the Benalder Street junction. It, like the similar work on Argyle Street, is done to a poor standard and provides a narrow space for cycling alongside the … [more]
Although the former steps connecting Milton Mains Road and Glenhead Road to the Great Western Road shared footway have been replaced by a ramp (as seen in #107326), at the other end the nearest dropped kerb (just out of the picture) assumes … [more]
The slab paving work at Ferry Road is now complete but the asphalt footway remains to be finished. Some graffiti has been painted over, but new graffiti has appeared. The obstruction seen in #173875 has been removed. The former cycle … [more]
The dropped kerb at the end of Ferry Road is now clear from obstructions (see #173875), but the footway surface is still incomplete.
"Cyclists Please Dismount" on NCN7 at Scottish Events Campus. Also "Pedestrians this way" without indicating a way. The footway is shared use. Update: The "No Cycling/Cyclists Please Dismount" sign in the photo above has since been … [more]
@simon_nuttall @RantyHighwayman @cyclestreets Huntingdon Rd, Huntingdon, near Tesco’s . Here is another death trap for school children, in Godmanchester. 🙁 https://t.co/i0oxszV6rZ Note: similar photo from nine years previously: #45746. … [more]
The sign on the gate says "No Parking" but there is no enforcement. The footway forms the link between the partly installed toucan crossing across Craighall Road and the canal path.
The odd narrow footway arrangement under the Castlebank Street railway bridge approaching NCN7. There is a dropped kerb to join the path immediately after the bridge (see #173856), while the rest of the road is just a dead-end alongside … [more]
The footway on the north side of Castlebank Street resumes, but is fenced off just west of the toucan crossing (as seen in #173896). That doesn't stop people using it, and a worn desire line is visible in the grass verge too. NCN7 crosses … [more]
The northern footway of Castlebank Street doesn't last long, and like South Street, has large gaps in it. A traffic island is the only aid for crossing. NCN7 shares the footway on the right with pedestrians. The site on the left is being … [more]
The Sawmill Road junction used to have the cycle path on a former railway bridge over the top of the road, but now that has been demolished, the cycle route is on the South Street shared footway to the right. The footway on this side … [more]
The northern footway on South Street comes to another break, and again there is a desire line worn in the grass. NCN7 is on the opposite shared footway. Meanwhile, a line of car showroom flags marks the course of the demolished former … [more]
The resumption of the South Street footway at Ferryden Street was brief, and it comes to an end again after the car showroom built on the course of the cycle path. The path used to cross Harmsworth Street here on a former railway bridge. … [more]
South Street, with worn desire line in the grass verge where there is a missing footway, a speed camera that has been out of use for a long time, a traffic counter, and NCN7 on the footway across the road.
South Street carries quite a lot of industrial traffic, due to the area it is in. So the cycle route (on the footway on the right) is so unattractive to these two cyclists that they prefer this road to the shared footway cycle route. The … [more]
The footway on this side of South Street resumes, with the worn desire line continuous from #173806. The NCN7 cycle route on the opposite footway is not good enough to attract these two to use it.
The toucan crossing is used to follow the cycle route which continues on the footway of the other side of South Street, but there is a clear desire line for staying on this side. There is a short break before the footway resumes at Ferryden … [more]
The diagonal cycle crossing from Bunhouse Road to the Kelvingrove Art Gallery still awaits commissioning.
The shared footway in Bunhouse Road has been covered in beige surfacing, except for a gap just beyond the crossing. The main pedestrian egress from the car park comes up the ramp on the left.
Still finishing work to be done on the rebuilt Bunhouse Road shared footway, and still no indication of priorities at the car park entrance.
Still finishing work to be done on the rebuilt Bunhouse Road shared foootway, and the cycle route sign is pointing the wrong way, and least for Loch Lomond.
The footway of Castlebank Street has been marked as a cycle route in OpenStreetMap, but there is no evidence to say so on the ground. However, it is a gap in the network, more direct and smoother in surface than the parallel NCN7 route, … [more]
Green strip cycleway missing parts, as well as being poorly implemented and signed, and blocked by scaffolding without any warning or diversion. Dropped kerb blocked by parked van.
Council destination sign all arms pointing the wrong way, and narrow green strip cycleway poorly implemented and signed.
Another view of #172734, showing the narrow footway between the toucan crossing and the boundary fence.
Not a promising look for the Sighthill "cycling village". A toucan crossing with not even a bike's length between the kerb and the fence at the back of the footway. See also #172813.
The shared footway on Bunhouse Road has been rebuilt, but has not had its dividing line reinstated. The zebra crossing has a random section of tactile paving nearby with no obvious purpose.
The pop-up cycle lane resumes, but only once the road happens to get wider. I bumped the kerb to allow the couple walking towards me to avoid walking single file. A decent permanent installation would not look like this.
The shared footway over the motorway bridge has a solid line marking near the railing. Is this because the railing is too low for a shared use footway/cycleway to be there?
The pop-up two-way cycleway, which only just began back at the Provanmill Road junction, ends, and gestures for cyclists to go onto the footway at the motorway bridge.
Although not itself part of the National Cycle Network, Sustrans has provided "This way to" stickers for NCN routes 7 and 75 for this section of signed cycle route which meets up with the NCN routes in Cessnock. This section is part of a … [more]
The Hillington Road footway link between the residential area of Hillington and the industrial estate is not signed as being anything other than an ordinary footway, but I remember it been shown as proposed for redetermination in part of a … [more]
Approaching the end of the Hillington Park cycle route shared footway on Mossland Drive. The section beyond Huntly Road is a dead-end and does not connect with anything. It does not even have a dropped kerb from which to join the … [more]