Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: An example of good practice |
Tags: | bicycle, bike, bollard, bridge, cambridge, carter, cyc, cyclepath, cyclist |
Date time: | 2.03pm, Friday 4th November, 2016 |
Time line: | Earlier | Later |
Facing: | South east |
Added by: | Flickr user: alasdair massie (imported by amassie) |
Copyright: | Attribution-NonCommercial-ShareAlike License |
Download: | View full-size original |
Source URL: | https://www.flickr.com/photos/amassie/30137988313/ |
Credit: | Alasdair Massie [Flickr username: 'alasdair massie'] |
Area: | Cambridge |
Going fishing!
Much improved bollard arrangement where Carter Bridge ramp joins Devonshire Road.
Personally I would have liked to see a centerline marked for 5m up the ramp to help warn of the bollard, but this arrangement is as clear as anyone could expect.
Mind you, people still ride the "wrong" side of the post,, like this guy going home from a fishing trip.
Comments reflect the views of the original submitter only.