Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: An example of good practice |
Tags: | #cycletowork, #cycletoworkday, a10, foxton, harston, video |
Date time: | 8.25am, Wednesday 14th September, 2016 |
Time line: | Earlier | Later |
Facing: | South west |
Added by: | radwagon |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Much improved shared-use path, although still a blockage at Foxton Railway Crossing. See radwagon.blogspot.com/2016/09/cycle-to-work-day.html
Comments reflect the views of the original submitter only.