Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | a3025, giveway, mcl |
Date time: | 5.43pm, Tuesday 12th May, 2015 |
Time line: | Earlier | Later |
Facing: | East |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Southampton |
The end of the segregated cycleway from Marsh Lane and the start of mandatory cycle lanes on Central Bridge, with motor traffic queuing for the Itchen Bridge.
Comments reflect the views of the original submitter only.