Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | bridge, cam, cambridge, clips, common, cycling, ditton, examples, ncn11, ncn51, railway, replacement, stourbridge, video |
Date time: | 6.06pm, Monday 17th February, 2014 |
Time line: | Earlier | Later |
Facing: | North east |
Added by: | radwagon |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Cambridge |
See clip at youtu.be/djnpaqxLlcQ
An update from these four.
www.youtube.com/watch
www.youtube.com/watch
www.youtube.com/watch
www.youtube.com/watch
A much better surface. I don't get the deep forearm pain that occured with the previous stripping. I do note that a little pain still happens at less than 5mph, but it is much less and at a much slower speed.
It'd be good if we get this kind of job done right first time the next time we approach it.
Comments reflect the views of the original submitter only.