Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: An example of good practice |
Tags: | advanced, bridge, cäcilienbrücke, cyclists, green, lift, oldenburg, study, tour |
Date time: | 1.01pm, Saturday 25th May, 2013 |
Time line: | Earlier | Later |
Facing: | South east |
Added by: | kbrumann |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | Video file (.mp4 format, 83MB) Video file (.mov format, 140MB) |
Credit: | Klaas Brumann |
Video of a narrow lift bride in Oldenburg dating from 1927. The bridge provides an advanced green for cyclists to cross first once it is lowered. The system works with cameras to ensure that all cyclists are travelling over the bridge before cars are given given green light to enter the bridge. See also video iitm.be/ceciliabridge
Comments reflect the views of the original submitter only.