Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: A problem that needs to be fixed |
Tags: | None |
Date time: | 4.44pm, Friday 23rd September, 2011 |
Time line: | Earlier | Later |
Facing: | South |
Added by: | alstorer |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Cambridge |
Awful cycle bypass round a rising bollard. Insane tactile paving. No idea what the sign post is.
Comments reflect the views of the original submitter only.