Add to Gallery: | Add this photo to a Gallery |
Category: | A track or path other than a cycleway mainly for walking: A problem that needs to be fixed |
Tags: | covid-19 |
Date time: | 1.01pm, Friday 9th June, 2023 |
Time line: | Earlier | Later |
Facing: | Unknown |
Added by: | widenmypath |
Copyright: | Public domain |
Area: | Bristol |
Widen the pavement and move the cycle lane to the right (away from the building). This will allow a continuous path for pedestrians to next to the building to keep walking without crossing the cycle lane, reducing conflict
Comments reflect the views of the original submitter only.