Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | addenbrookes, cambridge, crossing, parallelcrossing, toucan |
Date time: | 7.35pm, Tuesday 6th June, 2023 |
Time line: | Earlier | Later |
Facing: | South east |
Added by: | jtn20 |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Cambridge |
A toucan-style crossing by the AstraZeneca Travel/Logistics Hub (car/cycle park). Replaces a pedestrian crossing further north, which has been removed.
Comments reflect the views of the original submitter only.