Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | 30mph, cyclelane, droppedkerb, dualprovision, footway, mcl, paint, shareduse |
Date time: | 2.57pm, Sunday 4th June, 2023 |
Time line: | Earlier | Later |
Facing: | South east |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Renfrewshire |
The shared footway along Barrangary Road continues, and a cycle lane starts on the road. A dropped kerb is provided to transfer between the two.
A 30mph reminder sign has been provided on a lamppost, immediately beyond the 30mph commencement sign.
Comments reflect the views of the original submitter only.