Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | greenock, junction, ncn75 |
Date time: | 2.13pm, Sunday 4th June, 2023 |
Time line: | Earlier | Later |
Facing: | South west |
Added by: | dirkateur |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Gourock |
View to corner of Laird St where cycleway turns at pavement build-out (on former parking lane). Green surface stops for a short stretch.
Comments reflect the views of the original submitter only.