Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: A problem that needs to be fixed |
Tags: | junction, levernwalkway, path, surface |
Date time: | 1.11pm, Wednesday 17th May, 2023 |
Time line: | Earlier | Later |
Facing: | South east |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Barrhead |
The Levern Walkway heads straight on, despite the change in surface. This is where I look a wrong turn the first time I was here.
Comments reflect the views of the original submitter only.