Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: An example of good practice |
Tags: | a8renfrew, bollards, crossing, footway, new, path, shareduse, toucan |
Date time: | 11.28am, Sunday 2nd April, 2023 |
Time line: | Earlier | Later |
Facing: | North |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Renfrewshire |
The path from the new bridge across the Black Cart Water continues for a short distance on this side of the A8 before crossing to the other side where it continues all the way to the edge of Bishopton.
Comments reflect the views of the original submitter only.