Add to Gallery: | Add this photo to a Gallery |
Category: | A route temporarily barred to cycle access.: Event or temporary issue |
Tags: | bridge, canal, closed, forthandclydecanal, resurfacing, steps, towpath, workinprogress |
Date time: | 5.01pm, Tuesday 4th April, 2023 |
Time line: | Earlier | Later |
Facing: | North west |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
The section of canal towpath between the Murano Street bridge and Shakespeare Street (see #192196) remains closed for resurfacing.
Comments reflect the views of the original submitter only.