Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | bamford, derbyshire, ncn6 |
Date time: | 12.15pm, Friday 24th February, 2023 |
Time line: | Earlier | Later |
Facing: | North west |
Added by: | timbo |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | timbo |
Area: | Buxton |
Crossing the road on the Thornhill Trail to the Ladybower reservoirs, on the trackbed of the construction railway - NCN route 6 joins the trail here.
Comments reflect the views of the original submitter only.