Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: A problem that needs to be fixed |
Tags: | canal, forthandclydecanal, surface, towpath |
Date time: | 12.15pm, Tuesday 21st February, 2023 |
Time line: | Earlier | Later |
Facing: | South east |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
Poor surface on towpath beyond Ruchill Street.
[I have since learnt that this path is being upgraded shortly, see www.scottishcanals.co.uk/news/forth-clyde-canal-towpath-upgrade/ ]
Comments reflect the views of the original submitter only.