Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | cheltenham, double-yellow, droppedkerb, shareduse |
Date time: | 3.11pm, Wednesday 1st February, 2023 |
Time line: | Earlier | Later |
Facing: | South west |
Added by: | timbo |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | timbo |
Area: | Cheltenham |
Start of shared-use footway (with barriers around the corner)
Comments reflect the views of the original submitter only.