Add to Gallery: | Add this photo to a Gallery |
Category: | A route temporarily barred to cycle access.: Event or temporary issue |
Tags: | bridge, glasgow-cumbernauld, m8motorway, replacement, sighthill, steps, underconstruction, workinprogress |
Date time: | 12.22pm, Sunday 4th December, 2022 |
Time line: | Earlier | Later |
Facing: | North |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
The latest on the Sighthill Bridge construction site.
Comments reflect the views of the original submitter only.