Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Event or temporary issue |
Tags: | bollard, junction, standrewsdrive, swcw, trafficsignals, underconstruction |
Date time: | 11.47am, Sunday 4th December, 2022 |
Time line: | Earlier | Later |
Facing: | South west |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
The St Andrews Drive cycleway is physically rideable, but awaits completion of traffic signal works.
Comments reflect the views of the original submitter only.