Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | ‘york’cycle, action, bollards, ltn120, measurements, ncn65, respaced, terryavenue, york |
Date time: | 3.38pm, Tuesday 25th October, 2022 |
Time line: | Earlier | Later |
Facing: | South |
Added by: | rebba |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | Rebba |
Area: | Haxby |
[Image taken 25.10.22] Terry Avenue (entrance to Rowntree Park car park is first left), York. Re-spaced bollards. Now 84cm, 150cm (the minimum recommended in LTN1/20), 66cm. Context see: #185665.
Comments reflect the views of the original submitter only.