Add to Gallery: | Add this photo to a Gallery |
Category: | A route temporarily barred to cycle access.: Event or temporary issue |
Tags: | barrier, bridge, canal, forthandclydecanal, ncn754, steps, stockingfield, underconstruction |
Date time: | 1.52pm, Saturday 24th September, 2022 |
Time line: | Earlier | Later |
Facing: | South |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
The main arc of the new Stockingfield Junction bridge appears to be unofficially open, but the branch to Ruchill still has barriers. The steps provide a direct route option for pedestrians not needing the ramp.
Comments reflect the views of the original submitter only.