Add to Gallery: | Add this photo to a Gallery |
Category: | A track or path other than a cycleway mainly for walking: A problem that needs to be fixed |
Tags: | missedopportunity, ncn65, notwidened, postclementhorpefloodworks, routeopen, routereopened, terryavenue, york |
Date time: | 3.35pm, Saturday 10th September, 2022 |
Time line: | Earlier | Later |
Facing: | South west |
Added by: | rebba |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | Rebba |
Area: | Haxby |
[Image taken 10.9.22] Terry Avenue (Millennium Bridge/Butcher Terrace end), York. [Note: No street view at this location.] The route is slowly reopening after the Clementhorpe flood works (context and links: #164634). But why has CYC not taken the opportunity to make these two stretches wider? The minimum recommended width in LTN 1/20 is 3m for shared use routes. Plus why have these signs not been removed: #185668, #185661 to reduce congestion at the point the bridge meets the righthand track? And why did these #186101 get put in? Other image this route here today: #186100. Other image today and links: #186098.