Add to Gallery: | Add this photo to a Gallery |
Category: | A route temporarily barred to cycle access.: Event or temporary issue |
Tags: | bridge, scw, segregation, twoway, underconstruction |
Date time: | 12.13pm, Sunday 4th September, 2022 |
Time line: | Earlier | Later |
Facing: | North east |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
Work continues on the Gorbals Street cycleway, which will form part of the South City Way. Here on Victoria Bridge where work presently ends.
Comments reflect the views of the original submitter only.