Add to Gallery: | Add this photo to a Gallery |
Category: | A track or path other than a cycleway mainly for walking: Event or temporary issue |
Tags: | diversion, footbridge, interim, narrow, networkrail, pedestrian, railway, ramp, strathbungo, temporary, works |
Date time: | 10.28am, Sunday 4th September, 2022 |
Time line: | Earlier | Later |
Facing: | South west |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
While the Nithsdale Road railway bridge is being rebuilt, the Strathbungo footbridge in Moray Place has been made accessible, in advance of its permanent replacement. The work involves timber ramps at each side, leading to a step-free bridge deck. It is still rather narrow, and should be used with care.
Comments reflect the views of the original submitter only.