Add to Gallery: | Add this photo to a Gallery |
Category: | General road environment: A problem that needs to be fixed |
Tags: | acl, b8030, continuousfootway, cyclelane, junction, paint, vanparking |
Date time: | 1.08pm, Saturday 20th August, 2022 |
Time line: | Earlier | Later |
Facing: | South |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Bearsden |
Painted cycle lane on resurfaced Main Street, Milngavie. No improvements to road layout.
Comments reflect the views of the original submitter only.