Add to Gallery: | Add this photo to a Gallery |
Category: | A general photo.: A problem that needs to be fixed |
Tags: | cyclegulley, desireline, marygatecarpark, marygatelane, scarboroughbridgetoboothamparkimprovementsscheme, steps, stmarys, york |
Date time: | 5.31am, Monday 18th July, 2022 |
Time line: | Earlier | Later |
Facing: | North |
Added by: | rebba |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | Rebba |
Area: | Haxby |
[Image taken 18.7.22] St Marys/Marygate Lane, York. [NOTE: No street view at this location] There's a clear desire line to/from Marygate car park,. The fencing gets broken/removed and is repaired until someone creates a route through again - as in other parts of the car park: #184778, #184779. The cycle gulley is visible on the left. The steps are steep and you need to be strong: #184900. They are due to be replaced by a slope as part of the Scarborough Bridge to Bootham Park cycle route improvements scheme (see: #177537). Other image here today: #184896 and links.
Comments reflect the views of the original submitter only.