Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | hythe, kent, ncn2 |
Date time: | 11.02am, Sunday 27th March, 2022 |
Time line: | Earlier | Later |
Facing: | East |
Added by: | timbo |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | timbo |
Area: | Folkestone |
Sustrans 'milepost' (about 200 metres from the next one) by NCN route 2, Hythe
Comments reflect the views of the original submitter only.