Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | cornwall, ncn3, penzance |
Date time: | 3.28pm, Friday 13th May, 2022 |
Time line: | Earlier | Later |
Facing: | South west |
Added by: | timbo |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | timbo |
Area: | Bodmin |
Resurfaced shared-use path (NCN route 3) at the Eastern Green footbridge
Comments reflect the views of the original submitter only.