Add to Gallery: | Add this photo to a Gallery |
Category: | A sign, usually on the cycleway network, indicating a route for cycling.: A problem that needs to be fixed |
Tags: | clementhorpefloodalleviationscheme, clementhorpefloodworksdiversion, cyclesignage, diversion, missingsign, missingsignage, ncn65, nunnerylane, officialalternativeroute, price’slane, priceslane, signage, sketchysignage, terryave, terryavenue, terryavenuelivediversion, transpenninetrail, victorstreet, york |
Date time: | 4.45pm, Friday 25th March, 2022 |
Time line: | Earlier | Later |
Facing: | South |
Added by: | rebba |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | Rebba |
Area: | Haxby |
[Image taken on 25.3.22] Victor Street, junction with Nunnery Lane/Price's Lane, York. Despite being a clear cycle route and immediately opposite your standpoint, the cycle infra ahead is NOT the route you want if you are following the official alternative to Terry Ave during the Clementhorpe Flood Alleviation Scheme. Context and links: #180483
Comments reflect the views of the original submitter only.