Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | cambridge, chisholmtrail, ncn51 |
Date time: | 3.05pm, Friday 4th February, 2022 |
Time line: | Earlier | Later |
Facing: | North east |
Added by: | timbo |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | timbo |
Area: | Cambridge |
Junction left to the Abbey-Chesterton Bridge (Chisholm Trail) and right to the riverside route (NCN route 51)
Comments reflect the views of the original submitter only.