Add to Gallery: | Add this photo to a Gallery |
Category: | A place where cyclists will be delayed or need to take extra care, but they can still pass.: An example of good practice |
Tags: | burtonstonelane, contactdetails, contractors, informationboard, roadworks, temporarysignage, waterworks, york, yorkshirewater |
Date time: | 11.24am, Monday 29th November, 2021 |
Time line: | Earlier | Later |
Facing: | South |
Added by: | rebba |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | Rebba |
Area: | Haxby |
[Image taken 29.11.21] Burton Stone Lane, York. [Note: The works signs were removed 29.11.21] Details of the company doing the works, who it is on behalf of and a contact number, though not the duration of works. Context: #176416. Other images today: #176415 and links.
Comments reflect the views of the original submitter only.