Add to Gallery: | Add this photo to a Gallery |
Category: | A sign, usually on the cycleway network, indicating a route for cycling.: An example of good practice |
Tags: | cliftonings, cliftoningsfloodalleviationschemeliveworks, floodworks, ncn65, ouse, sign, signage, sustrans, works, york |
Date time: | 1.56pm, Thursday 25th November, 2021 |
Time line: | Earlier | Later |
Facing: | North |
Added by: | rebba |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | Rebba |
Area: | Haxby |
[Image taken 25.11.21] Clifton Ings, York. [NOTE: Location approximate and no streetview along the route.] Clifton Ings Flood Alleviation Scheme details. Very clear. And several of these signs along the route (NCN65). Work started as soon as these went up: October 2021. Due to continue til “Autumn 2023”. Other image here today: #176153. Other images today: #176154, #176155, #176156, #176157, #176158, #176159, #176160, #176161, #176162, #176163.
Comments reflect the views of the original submitter only.