Add to Gallery: | Add this photo to a Gallery |
Category: | A sign, usually on the cycleway network, indicating a route for cycling.: A problem that needs to be fixed |
Tags: | clementhorpefloodworksdiversion, cyclesignage, diversion, ncn65, stbenedictroad, transpenninetrail, upperpricestreet, york |
Date time: | 2.23pm, Friday 8th October, 2021 |
Time line: | Earlier | Later |
Facing: | North east |
Added by: | rebba |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | Rebba |
Area: | Haxby |
[Image taken 8.10.21] St Benedict Road junction with Upper Price Street, York. Signposting clearly aimed at cyclists. It is part of the year-long Clementhorpe floodworks diversion. But it is not route- or diversion- or direction- specific. See also: #174778 and links
Comments reflect the views of the original submitter only.