Add to Gallery: | Add this photo to a Gallery |
Category: | A place where cyclists will be delayed or need to take extra care, but they can still pass.: Event or temporary issue |
Tags: | corduroy, incorrect, new, tactiles, underconstruction |
Date time: | 2.08pm, Wednesday 6th October, 2021 |
Time line: | Earlier | Later |
Facing: | North east |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
Slow progress on the North Canal Bank Street cycle track. The surface is now in on the cycle track side, but not the pedestrian side. The tactile paving is still the incorrect tyre-grabbing hazard type.
Comments reflect the views of the original submitter only.