Add to Gallery: | Add this photo to a Gallery |
Category: | A narrow place, difficult for cycles to pass.: A problem that needs to be fixed |
Tags: | ncn65, puddling, rain, scarboroughbridge, transpenninetrail, water, york |
Date time: | 1.50pm, Monday 27th September, 2021 |
Time line: | Earlier | Later |
Facing: | North |
Added by: | rebba |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | Rebba |
Area: | Haxby |
[UPDATE: On 1.10.21 CYC said intervention is planned - bespoke drainage covers - and should be completed within six weeks.] [Image taken 27.9.21] Scarborough Bridge, York. [NOTE: No streetview at this location.] The puddling following rain has not been solved on this bridge, opened in April 2019 (previous image: #168503). The puddling was still here the next day. Other image here today: #174508. Other images today: #174488 and links.
Comments reflect the views of the original submitter only.