Add to Gallery: | Add this photo to a Gallery |
Category: | A place where cyclists will be delayed or need to take extra care, but they can still pass.: A problem that needs to be fixed |
Tags: | cop26, corduroy, incorrect, kerb, new, olddumbartonroad, ramp, roadworks, slow, tactiles, underconstruction |
Date time: | 4.40pm, Sunday 19th September, 2021 |
Time line: | Earlier | Later |
Facing: | East |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
The crossing to the east of Bunhouse Road has now been provided with asphalt ramps to aid pedestrians crossing. No sign of either dropped kerbs or raised crossings being installed. Incorrect corduroy (hazard) tactile paving is still in place instead of cycleway style slabs.
The council claims this route will be complete in time for the COP26 conference, since the cycle route diversion will be coming along here. The cycle track is incomplete just up the hill.
UPDATE: The raised crossing has now been installed, see #175266, but the cycleway remains incomplete going up the hill. The incorrect tactile paving remains unchanged.