Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | crossing, ncn7, shareduse, toucan, underpass |
Date time: | 1.22pm, Friday 3rd September, 2021 |
Time line: | Earlier | Later |
Facing: | North west |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
Looking towards #173895, this is where the Loch Lomond Railway Path used to start. Now the gap in the underpass wall has been filled in and the former railway embankment demolished, so NCN7 crosses Castlebank Street using this toucan crossing, and continues on the opposite side of the road.
Comments reflect the views of the original submitter only.