Add to Gallery: | Add this photo to a Gallery |
Category: | A place where cyclists will be delayed or need to take extra care, but they can still pass.: Event or temporary issue |
Tags: | bridge, droppedkerb, kelvin, railway, roadworks, wcw |
Date time: | 1.17pm, Wednesday 8th September, 2021 |
Time line: | Earlier | Later |
Facing: | North east |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
Roadworks continue on Ferry Road. The surface on the footway is still incomplete.
Updated at #175001 and #175002.
Comments reflect the views of the original submitter only.