Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: A problem that needs to be fixed |
Tags: | access, bollard, broken, cyclesonly, damage, link, ncn7, roundabout, surface, treeroot |
Date time: | 1.33pm, Monday 30th August, 2021 |
Time line: | Earlier | Later |
Facing: | North east |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
A new cycle access point to the NCN7 path at the Beith Street/Rosevale Street roundabout, but nothing done to rectify the adjacent tree root damage.
Comments reflect the views of the original submitter only.