Add to Gallery: | Add this photo to a Gallery |
Category: | A narrow place, difficult for cycles to pass.: A problem that needs to be fixed |
Tags: | a814, access, busway, crossing, fastlink, ifsd, junction, kerb, ncn75, railing, toucan |
Date time: | 2.10pm, Monday 16th August, 2021 |
Time line: | Earlier | Later |
Facing: | South |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
The lack of a connection from James Watt Street to the riverside NCN75 path and the Tradeston Bridge (visible background left) continues to make this a difficult place to cycle. A gap through the kerb and railing on the far side of the junction to cross the Fastlink busway would sort this. But instead there is a toucan crossing across James Watt Street, where the footways are not shared-use, and so of no use to anyone cycling. See also #173270.
Comments reflect the views of the original submitter only.