Add to Gallery: | Add this photo to a Gallery |
Category: | A narrow place, difficult for cycles to pass.: A problem that needs to be fixed |
Tags: | bridge, filteredpermeability, gate |
Date time: | 4.28pm, Wednesday 19th May, 2021 |
Time line: | Earlier | Later |
Facing: | East |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
A gate has been provided across the full width of the road beyond the station. Partly due to its colour, I didn't realise it covered the full width of the road until I'd passed the last opportunity to leave the carriageway and join the (perhaps shared) footway. See also #169536.
Comments reflect the views of the original submitter only.