Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: A problem that needs to be fixed |
Tags: | access, canal, connection, forthandclydecanal, link, ncn754, resurfacing, surface, towpath, unsurfaced |
Date time: | 1.57pm, Monday 17th May, 2021 |
Time line: | Earlier | Later |
Facing: | West |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
Although the main towpath has been resurfaced, nothing has been done about the poor connection from the towpath to the path to Vaila Street. In addition to local access, this is important for making connections between the canal and Summerston and the Garscube Estate, so will see some commuter use.
Comments reflect the views of the original submitter only.