Add to Gallery: | Add this photo to a Gallery |
Category: | A general photo.: A problem that needs to be fixed |
Tags: | citywalls, floodgates, floodworks, lendalbridge, pavement, road, scaffolding, station, stationavenue, york |
Date time: | 3.02am, Friday 14th May, 2021 |
Time line: | Earlier | Later |
Facing: | East |
Added by: | rebba |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | Rebba |
Area: | Haxby |
Update: Light still out 27.6.21. [Update: A reply in the name of the Customer & Resident Services Manager on Monday, 24 May 2021, 13:25:52 said: The current status of your report is: closed - development works. This street light has been temporarily disconnected due to development works and will be reconnected once the works have been completed.] [Image taken 14.5.21] Station Ave junction with Station Road, at the city walls, York. At least one light seems to be out. The pavement on the eastern (Lendal Bridge) side is very narrow. The width is further reduced by scaffolding for works on the walls. There’s additional pressure on this location as the flood gates below are being replaced and people are needing to use routes at this level while the riverside paths are closed (see: #168886). This includes many people pushing their cycles to reach Leeman Road (and the route through Esplanade car park: #166177) to return to the riverside paths.
Comments reflect the views of the original submitter only.