Add to Gallery: | Add this photo to a Gallery |
Category: | A place where cyclists will be delayed or need to take extra care, but they can still pass.: A problem that needs to be fixed |
Tags: | crossing, cycletrack, droppedkerb, guidancepath, new, redevelopment, sighthill, tactiles, two-way, underconstruction |
Date time: | 12.31pm, Friday 23rd April, 2021 |
Time line: | Earlier | Later |
Facing: | South east |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
The cycle track alongside Fountainwell Road ends here, with some Guidance Path tactile paving. It looks suspiciously like it will go no further on this side, and it crosses over to a new path on the other side of what can be quite a busy (and fast) road.
The map of the Sighthill redevelopment plans showed it continuing to the end of the road. www.glasgow.gov.uk/CHttpHandler.ashx
Comments reflect the views of the original submitter only.