Add to Gallery: | Add this photo to a Gallery |
Category: | General road environment: Other (infrastructure-related) |
Tags: | brownfield, busstop, new, redevelopment, road, underconstruction |
Date time: | 4.12pm, Thursday 22nd April, 2021 |
Time line: | Earlier | Later |
Facing: | North west |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Dunbartonshire |
The new road between Clydebank College and Cable Depot road. This section is as yet unopened, but I saw a few people on bikes using it. At this end, it connects with NCN7. There are bus stops, but no cycle facilities along the road.
Comments reflect the views of the original submitter only.