Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | new, olddumbartonroad, surface, underconstruction |
Date time: | 2.17pm, Wednesday 17th February, 2021 |
Time line: | Earlier | Later |
Facing: | West |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
The new cycle track on Old Dumbarton Road has expensive stone kerbs and divider strips, but the top surface has not been machine laid, so is lumpy and uneven. Disappointing.
The cycle track replaces on-street metered parking.
Comments reflect the views of the original submitter only.