Add to Gallery: | Add this photo to a Gallery |
Category: | General road environment: Other (infrastructure-related) |
Tags: | cambridge, newdevelopment, timberworks |
Date time: | 1.35pm, Friday 25th December, 2020 |
Time line: | Earlier | Later |
Facing: | Bearing of 110° |
Added by: | simon |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Cambridge |
Timber Works new development.
Comments reflect the views of the original submitter only.