Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: An example of good practice |
Tags: | cambridge, infrastructuretour, ncn11 |
Date time: | 3.21pm, Tuesday 3rd March, 2020 |
Time line: | Earlier | Later |
Facing: | Bearing of 84° |
Added by: | simon |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Cambridge |
A very Cambridge image, on an infrastructure tour visiting the site of the construction of the Abbey-Chesterton bridge forming a key link on the Chisholm Trail.
Comments reflect the views of the original submitter only.